Construction projects here at Pete’s Camp

For a while now we have been living with a big construction project that when completed will give the residents town water to their homes. This required ditches to be dug and pipes laid all over the camp. It has made driving an interesting proposition and a resident or two have driven into the ditch on their street. This is all coming to an end the project is nearing completion and the ditches are being filled in today. The construction crew started the process yesterday and they are working on my street today. Having water piped to each house will, in the long run, save the owners money. The more water one uses the quicker the pay back. As a gardener with over twelve trees and lots of bushes I use a lot of water about 1500 gallons a month. This costs me about sixty-five dollars each month to have it delivered with the new system the costs shout drop to about fifteen dollars a month or so I am told. Here are some photos of the construction work going on.

GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA GEDSC DIGITAL CAMERA

Categories: Uncategorized | Leave a comment

Post navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: